Date/Day/Time Agency Activity Download
July 24, 2022 | 0500H to 1800H NGCP

 

Please be informed that there will be an NGCP Scheduled Power Service Interruption on July 24, 2022 (Sunday) from 5:00am to 6:00pm in Real, Infanta, and General Nakar, Quezon. The reasons are:

Lumban SS 50MVA Transformer

a. Splitting of 69kV Bus at Lumban SS
b. Installation of 69kV Gantry DS
c. PM of associated HVE and correction of hotspot

Lumban-Famy 69kV Line

a. Transfer of Famy Line Control to new (spare) BCU
b. Resetting of Lumban-Famy 69kV Feeder Protection at Lumban Side
c. Test & Commissioning of new Feeder Protection at Famy SS
d. Energization of 69kV PCB at Famy SS
e. Preventive/corrective maintenance along the line
f. Implementation of Woodpole Replacement Project

May 17, 2022 / 0800H to 1600H NGCP

 

Lumban-Famy 69kV Line

a. Resetting of feeder protection at Lumban side to cover the additional line segment of QUEZELCO

b. Testing of by-pass switch at Famy SS

Note: Closing of By-pass Switch at Famy SS after completion of above activities to provide continuous supply to QUEZELCO during the shutdown of Famy-Comon PCB until energization.

April 29, 2022 | 0900H to 1100H Local Power Interruption

 

LOCAL POWER INTERRUPTION

Pullout of 1 unit 25kVA Distribution Transformer of Goldern Pacifica Resort in Barangay Dinahican.

Affected Areas: Barangay Dinahican and part of Barangay Binulasan in Infanta, Quezon

April 22, 2022 | 0900H to 1200H Local Power Interruption


LOCAL POWER INTERRUPTION

For conversion of line assembly (Building construction ongoing with close range on primary line)

Affected Areas: Malapad, Lubayat, and Pandan barangays of Real, Quezon

April 19, 2022 | 0001H to 0500H NGCP

Lumban 50MVA Transformer for the Substation Corrective Maintenance Activities

a. Urgent correction of hotspot at Phase Bsecondary bushing of 8XF01LMN
b. Refilling of additional SF6 gas at CB04(5LI1LMNFAM)
c. Testing of OLTC in preparation for the transformer tap-changing as per transformer tap changer operating guidelines for dry season

April 10, 2022/ 0700H to 1200H NGCP

Line to be De-energized
Lumban SS 50MVA Transformer

MTDA to conduct re-testing of OLTC in preparation for the transformer tap-changing as per transformer tap changer operating
guidelines for dry season.

All works maybe finished ahead of time and power maybe restored earlier than scheduled, please consider our lines always energized.

Thursday, March 17, 2022 | 0900H to 1600H Local Power Interruption

Relocation and Insertion of Poles on Thursday, March 17, 2022 from 9:00 AM to 4:00 PM. Affected areas are Pandan and part of Lubayat barangays in Real, Quezon.

Wednesday, March 16, 2022 | 0900H to 1200H Local Power Interruption

Relocation of pole (Baarangay and BOD/Dir. Oliva's Request) on Wednesday, March 16, 2022 from 9:00 AM to 12:00 Noon. Affected areas are part of Poblacion Bantilan, Catambungan, and Pinaglapatan barangays.

February 16, 2022 0600H to 0700H / 1700H to 1800H NGCP

Lumban-Famy and Famy-Comon 69kV Line

0600H to 0700H

Momentary interruption as per request of FLECO for the isolation of their Famy SS Substation for their uprating of 10MVA to 20MVA and Replacement of 69kV metering CT

1700H to 1800H

Momentary interruption for the reconnection of FLECO Famy Substation after the completion of their uprating and replacement activities

(Activities maybe finished ahead of time and momentary interruption may be adjusted earlier after the completion of activities)

February 5, 2022/ 0600H to 1800H NGCP

Famy-Comon 69kV Line

a. Preventive/ Corrective Maintenance along 69kV Sub Transmission Line

b. lmplementation ol Woodpole Replacement Project along with the line

c. Preventive Maintenance and Testing of associated high voltage equipment at Famy Load-End Station